vialroom

#vendor-verification 2024-10-28

Monday36 messages10 participantstimes are UTC
Highlights from this day
  • relabel_watch — for the archive do blinded submissions carry more weight than open ones 19:33
  • tenpence — does ERP being verified mean my vial is fine 19:54
  • tb500_tobias — unrelated but update from 13 months ago: FGP added evidence and the entry now reflects it 20:31
  • tb500_tobias — has anyone ever offered to pay for verification 20:48
  • tb500_tobias — a lot number mismatch between the vial and the certificate is a serious finding. post it with photos of both nothing gets deleted from the log, including our own… 21:01
RW

for the archive do blinded submissions carry more weight than open ones

👍67
NP

what counts: an independent report, on a lot you bought yourself, with the lot number, from a lab the room recognises

verification has never been for sale and never will be. offers get posted publicly with the sender redacted, still working it out

thin evidence

NP

what does not count: the supplier certificate alone, a screenshot, a referral link, or a friend who says it was fine

T5

unrelated but update from 13 months ago: FGP added evidence and the entry now reflects it

T5

we have never revoked on a single result. we have revoked on a pattern

T5

a verified supplier can still ship you a bad vial. verification is about the record, not about your parcel

a lot number mismatch between the vial and the certificate is a serious finding. post it with photos of both
nothing gets deleted from the log, including our own mistakes

SO

the mods maintain the log. the room supplies the evidence and argues about it, which is the correct division

how long does a verification stay current before it needs refreshing

GG

a good result with bad sample handling gets logged with a note about the handling. context is part of the record, ill dig out the number

is the verification log the same thing as a recommendation

VL

the lot number on the certificate does not match my vial, what now

log it either way

NP

how do you handle a result that is good but the sample handling was poor

who decides, the mods or the room

a supplier improving shows in the log as later entries, not as earlier entries being edited