i have watched this standard hold for three years including when it was inconvenient for a popular supplier
#vendor-verification 2026-05-31
- vialkeeper — i have watched this standard hold for three years including when it was inconvenient for a popular supplier 18:55
- vialkeeper — has verification ever been reinstated after a revocation 20:08
- panel_before_after — coming back to this verification has never been for sale and never will be. offers get posted publicly with the sender redacted, for what its worth 20:27
if you want to help, buy a lot, test it, and post the report with the lot number. that is the whole contribution
the mods maintain the log. the room supplies the evidence and argues about it, which is the correct division
log it either way
is a screenshot of a report ever acceptable
has anyone ever offered to pay for verification
how do you handle a result that is good but the sample handling was poor
a lot number mismatch between the vial and the certificate is a serious finding. post it with photos of both, ill dig out the number
the point of the standard is that it applies to suppliers we like as well as ones we do not
has verification ever been reinstated after a revocation
two labs a point or two apart on one lot is normal. both go in the log with both numbers
if the evidence is thin the entry says the evidence is thin. that is more useful than a score, happy to be corrected
a good result with bad sample handling gets logged with a note about the handling. context is part of the record
coming back to this verification has never been for sale and never will be. offers get posted publicly with the sender redacted, for what its worth
the log is readable chronologically and that is deliberate. the trajectory matters more than the current line
blinded submissions carry more weight because they remove a variable, not because we distrust the labs
thats not evidence
a verified supplier can still ship you a bad vial. verification is about the record, not about your parcel
both numbers go in
verification is revoked on a confirmed failure and the revocation stays in the log permanently
blinded is better